Home Ent Systems
Home Home Ent Systems FDeg Hardware. CCNA 1 (eve) CCNA 2 (eve) CCNA 2 (Disc). Security CCNA 3 (Fdeg) IT Systems Repair CCNA 3 (eve) IT Ess1 (eve) Setting up Networks Control With IT Apprentices Contact Info Calendar Other Stuff

 

Class times
Mon 9:00 - 10:30 (Class11)
 Room 102

Task 1 should now be in
Task 2 should now be in
Task 3 due in 9th December

WARNING
 If Task 3 is not received on time you may
not be able to achieve a Merit or Distinction.
(It must be a good effort)

Assignment

19 Sep 1.Televisions    
26 Sep 2.Further Televisions Specifications    
3 Oct 3.Home Entertainment Equipment Start Task 1 Task1  
10 Oct 4.Complete Task 1 - Compare DVD with BD Task1  
17 Oct 5.First look at Task 2 (look at connections)    
24 Oct Half Term    
31 Oct 6.Connectors - Lecture    
7 Nov 7.Connectors - Task 2    
14 Nov 8.Finishing off Task 2    
21 Nov 9. Logs, Decibels and Noise    
28 Nov 10. Noise Sources and prevention    
5 Dec 11. Noise.ppt    
12 Dec 12. Electrical Voltage, Current and Power. Task 3 in  
19 Dec Christmas    
26 Dec Christmas    
2 Jan New Year    
9 Jan 13. Sine waves and wavelength.    
16 Jan Theory of signals 1    
23 Jan Theory of signals 2    
30 Jan Theory of signals 3    
6 Feb Assignment Work    
13 Feb Half Term    
20 Feb Look at satellite    
27 Feb      
5 Mar      
12 Mar      
19 Mar      
26 Mar      
2 Apr Easter    
9 Apr Easter    
16 Apr      
23 Apr      
30 Apr      
7 May Bank Hol    
14 May      
21 May      
28 May      
4 Jun Half Term    
11 Jun      
18 Jun      
25 Jun      

 

Tasks should be sent to

email it to gshering2012@gmail.com

with the subject containing
"your name Class11 Task X"

Each task as a separate email

Progress Grid (Class11).

WARNING
OVERDUE TASK 3
IF NOT RECEIVED YOU MAY NOT BE
ABLE TO ACHIEVE A DISTINCTION

ID Task ...... 1 2 3

4

5 6 Final Comments
  Grad   P1 P2 P3 M2 D2 P4 M3 P5 M1 D1 P6 M4    
  Date   14/10 18/11 9/12 3/2 30/3 1/6    
SA               Task 4 Overdue
MA               P2 Part 2 missing
D2 not attempted
Task4 only part attempted
AC   *.*.             Task 3 & 4 Overdue
ND               Task 4 Overdue
MF   2 2             M2,D2 to add
DG 23/1               Task 4 Overdue
JH               On Target
DH               On Target
SH               Add a bit more for D2
CJ 23/1               Task 4 Overdue
JL   R R             M2 D2 not attempted
Task 4 Overdue
LM               D2 add a bit more.
Task 4 Overdue
AN   R R              
JN   R *.*. *.*.           Task 3 & 4 Overdue
JR 16/1   R R R              
SR                
GS 23/1               Task 4 Overdue
RS   2 R R R             Task1 Rework requ.
Task 4 Overdue
MT 23/1   R R R R R              
GT   *.*.             Task 3 & 4 Overdue
MU 16/1               On Target
                                 
                                 
Last update 20 Feb  2012

Key   or  =  Complete     A  = Absent 
R= Received being evaluated.    W = Withdrawn
= Not Complete or rework/enhancement required.
2 = Second rework/enhancement required.
= Fail (Insufficient and passed final deadline/given up or failed test twice)
• = Over due get it in now or I can't find it.
*.*. about to be FAILED this grade
*Attend catch-up class

(Tutor Sue Marr)

 

Home Home Ent Systems FDeg Hardware. CCNA 1 (eve) CCNA 2 (eve) CCNA 2 (Disc). Security CCNA 3 (Fdeg) IT Systems Repair CCNA 3 (eve) IT Ess1 (eve) Setting up Networks Control With IT Apprentices Contact Info Calendar Other Stuff

....          ....